POWER STATION
PROJECT – Remove and clean pigeon guano from pipework at power station.
Brief: To be completed in 12 hour period.
Location: S.E London.
Before
After
Before – During London School cleanup operation.
After – After London School cleanup operation.
PROJECT – Power Station basement.
Brief: To custom fit pigeon exclusion mesh frame.
Location: London.
Before
After